Works Carried Out

A brief description of works we carried out in rigs:

Overhaul of Ballon actuators in the pump room.

Install new pipes in Mud system.

Installation of the A frame Winch System of Oceaneering.

Flushing of hydraulic pipes for Top drive and Derrick systems.

Install all plumbing galleries.

Complete and entire refurbishment, installation and commissioning of the Ballast system.

Machining and Overhaul of Hydraulic’s on Torquemaster and Pipe Handling Machine.

Renew around 3000 Meters of ventilation pipe for Ballast tanks.

Install and commissioning of new hydrophone.

The installation, commissioning of all Hydraulic control panels for the entire Ballast system.

Overhaul and commissioning of Flap Valves in Ventilation Ducts for firefighting system, all succeded DNV class approval first time round.