Marine systems

Marine Systems

Main AC pumps; Inspect, repair, pressure test and commission.
Seawater cooling system; complete system mechanical equipment refurbishment and commissioning.
Hydrophone; Install new hydrophone skin valves.
Ballast system; complete refurbishment and commissioning of pump room mechanical equipment.
Mooring system; remove, refurbish, and reinstate fairleads.
 Propulsion; overhaul hydraulic system for variable pitches propellers. Remove, overhaul, repair and bench test hydraulic pumps, reinstate and commission system.
Propulsion system; repair hydraulic components of the jacking and locking pins system of Aquamaster Azimuth thruster cans.
Power generation; Provide technical support for the overhaul of the MAN engines.
Fuel oil system; Fabrication and installation of two platforms for centrifuges.
Deck crane; Provide technical support to Sparrows Offshore during the replacement, commissioning and load test of the Seatrax deck crane.
Deck crane; Refurbishment of hydraulic systems of the remaining three Seatrax deck cranes.

Engineering study, planning pre fabrication and vendor co-ordination for the removal and replacement of Wartsila Azimuth thrusters.

Seawater cooling system; Refurbish the seawater cooling pumps and valves.
Positioning; Install new hydrophone skin valve.
HVAC system; Main Air Condition system overhaul and commissioning.
HVAC system; Manufacture and replacement of various air conditioning ducting.
Fire main system; Manufacture and replacement of the pipe spools.
Ballast system; Manufacture and installation of the main Sea Chest pipe spools.
Ballast System; Overhaul of the ballast system valves.
Mooring system; remove, refurbish, and reinstate fairleads

Helifuel system; modification of the helicopter fuelling system pipework to allow installation of new flow meter.

 Bunkering system; manufacture and install 130meters of stainless piping and valves in fresh water system.
 Renew HP Air line for compressor APV.
 Structural; install supports for temporary stairway between quay side barge and platform.
 Structural; general fabrication work and structural repairs.
 Waste treatment; Manufacture and install new sewage treatment plant and replace black waterlines.

 Helifuel system; modification of the helicopter fuelling system pipework to allow installation of new flow meter.
 Bunkering system; manufacture and install 130meters of stainless piping and valves in fresh water system.
 Renew HP Air line for compressor APV.
 Structural; install supports for temporary stairway between quay side barge and platform.
 Structural; general fabrication work and structural repairs.
 Waste treatment; Manufacture and install new sewage treatment plant and replace black waterlines.

 Mooring; removal, overhaul and reinstatement of fairleads.
 Propulsion; Thruster HPU overhaul, replacement of thruster HPU lines, flushing thruster hydraulic system prior to startup.

 Mooring; Mooring winch overhaul and commissioning.
 High Pressure Test on pipes.

 Power generation; Supply technical assistance to Wartsila for main engine overhauls.
 Works in Cement unit; Supply technical assistance to remove redundant cement unit.
 Thruster replacement; Supply technical assistance to Rolls Royce for replacement of 4 thrusters.
 Fire damper system; Supply technical assistance for the refurbishment of the HVAC fire damper system.