Adecuation Projects

Adecuation Projects

MPD structure prefabrication installation, deck reinforcement.

MPD equipment installation and commissioning.

Burner boom pedestal, reinforcement and commissioning.

Build a new deck.

Hoses pressure test.

Drill pipe inspection.

Tank cleaning and several additional works

Used Drill Pipe & Tubing Work String Inspection

Full inspection to DS-1 Cat: 3-5 DS-1
MPI connection in conjunction with DS-1 Cat: 4 Inspection DS-1
Standard Inspection to API RP 7G-2 DS-1
MPI connection in conjunction with Standard API RP 7G-2 Inspection API RP 7G-2
Moderate Inspection with Full Dimensional & MPI of critical areas to API RP 7G-2 API RP 7G-2
Moderate Inspection of Tubing Work-String to API RP 7G-2 API RP 7G-2

Inspection of Drill Collars, Hevi-Wate Drill Pipes, Subs, Stabilizers, etc.

Hevi-Wate Drill Pipe Inspection to DS-1 Cat: 3-5 DS-1
Hevi-Wate Drill Pipe Inspection to API RP 7G-2 API RP 7G-2
Drill Collar Inspection to DS-1 Cat: 3-5 DS-1
Drill Collar Inspection to API RP 7G-2 API RP 7G-2
Moderate Inspection with Full Dimensional & MPI of critical areas to API RP 7G-2 API RP 7G-2
Inspection of Subs, Stabilizer, Valves, Lift Subs, Reamers, Hole-Openers to DS-1 Cat: 3-5 DS-1

Visual Inspection of New & Used Tubing and Casing

Casing & Tubing Inspection including VTI, Full Length Drifting, Colour Coding, Traceability Check API 5CT/API 5A5/API 5C1/API 5B1.

Field Repair

Field refacing of Sealing Shoulder for Commonly Used API Connections.
Hard Stamping of Serial Numbers.
Traceability Service against Original QDP (provided by client).

Cleaning & Refurbishment of Drill Pipe, Tubing Work String, Drill Collar, Hevi-Wate Drill Pipe, Subs, etc.

External, internal and coating.
Cleaning & Refurbishment of New & Used Casing
External, internal and coating.